A PROJECT MANAGER IS FACED WITH MAKING A DECISION ABOUT A RISK THAT...

2. A project manager is faced with making a decision about a risk that theteam has identified. The risk involves the design of a bicycle. It has beenfound that the neck of the bicycle, where the steering bearing is locatedand the two supporting bars of the frame come together, will corrodein a high salt environment. If this takes place the neck may fail andinjure the rider. The project team decides that the design of the bicycleshould be modified by using corrosion resistant materials in the designof the neck. This will eliminate the risk from consideration. This tech-nique is called:a. Risk avoidance.b. Risk acceptance.c. Risk rejection.d. Risk deflection.