EXERCISE 3-17 (30 MINUTES)

1. The predetermined overhead rate is:

Estimated total manufacturing overhead cost

Predetermined = overhead rate Estimated total amount of the allocation base

Sfr 900,000

= = 12 Sfr per MH.