58. In a sand casting operation, the total liquid head is maintained constant such that
it is equal to the mould height. The time taken to fill the mould with a top gate is
A.
t If the same mould is filed with a bottom gate, then the time taken is t
B.
Ignore the time required to fill the runner and frictional effects. Assume
atmospheric pressure at the top molten metal surfaces. The relation between
and
t t is:
A B(A) t
B = 2 t
A(B) t
B = 2 t
At = t
A(C)
B2
(D) t
B = 2 2 t
A