9 YES. AS THE ANTICIPATED LEVEL OF ACTIVITY ANALYSIS IS USED WHEN A...
5-9
Yes. As the anticipated level of activity
analysis is used when a variable cost is a func-
changes, the level of fixed costs needed to sup-
tion of only a single factor. If a cost is a function
of more than one factor, multiple regression
port operations will also change. Most fixed
analysis should be used to analyze the behavior
costs are adjusted upward and downward in
of the cost.
large steps, rather than being absolutely fixed at
one level for all ranges of activity.