30. PLT454 ATP
The weight and CG of an aircraft used in 135 operations must have been calculated from those values established by actual
weighing of the aircraft within what period of time?
A) Multiengine aircraft, last 36 calendar months; single-engine, last 24 calendar months.
B) Multiengine and single-engine aircraft, preceding 36 calendar months.
C) Multiengine aircraft, preceding 36 calendar months.
Bạn đang xem 30. - BANK AIRLINE TRANSPORT PILOT AIRMAN KNOWLEDGE TEST QUESTION BANK PPT