CORRECT ANSWER D. THE COST OF THE CRANE TO MOVE MATERIALS WOULD...
224.
Correct answer d. The cost of the crane to move materials would most likely be treated as a
sunk cost in differential cost analysis as this cost is not likely to differ among alternatives.