EXERCISE 3-17 (30 MINUTES)

6. The predetermined overhead rate would have been:

Estimated total manufacturing overhead cost

Predetermined = overhead rate Estimated total amount of the allocation base

$240,000 160% of direct

= $150,000 direct labor cost = labor cost