6. The predetermined overhead rate would have been:
Estimated total manufacturing overhead cost
Predetermined = overhead rate Estimated total amount of the allocation base
$240,000 160% of direct
= $150,000 direct labor cost = labor cost
Bạn đang xem 6. - SOLUTIONS TO QUESTION MANAGERIAL ACCOUNTING CH03 SYSSTEMS DESIGN JOB ORDER COSTING