3. Yes; if some jobs required a large amount of machine time and little la-
bor cost, they would be charged substantially less overhead cost if a
plantwide rate based on direct labor cost were being used. It appears,
for example, that this would be true of Job 203 which required consid-
erable machine time to complete, but required only a small amount of
labor cost.
© The McGraw-Hill Companies, Inc., 2006. All rights reserved.
Solutions Manual, Chapter 3 77