QUESTIONS 12 THROUGH 15 REFER TO THE DIAGRAM IN FIGURE 2 AND THE TABLE...

21. Resource leveling will generally:

a. Reduce the time needed to do the project.

b. Increase the total time necessary to do all the tasks.

c. Reduce the overutilization of resources.

d. Reduce resources to the lowest skill that is possible.